Home >  Term: time variance (TV)
time variance (TV)

The difference between budgeted cost of work performed (BCWP) and budgeted cost of work scheduled (BCWS) in weeks.

0 0

Creator

  • Peteh
  •  (V.I.P) 14225 points
  • 100% positive feedback
© 2024 CSOFT International, Ltd.